Skip to main content
Home
Restoring London's Lost Route to the Sea
  • Login
  • About the Canal
    • Canal history
    • Detailed maps of the canal
    • Information posts
    • Printable map of the Canal
    • Restoration Pictures
    • Canoes & Boats
    • Walking & Cycling Routes
    • Wildlife photos
  • About the Trust
    • The first 50 years
    • Who's Who
    • Office contact details (phone & address)
    • Canal Centre Loxwood
    • Shalford Information Centre
  • Boat Trips
    • Special Cruises and Public Trips
    • Private Trips
  • Newsletters
    • eNewsletter
    • Working Party News
    • Wey & Arun Canal News
    • Wey-South
    • Subscribe to newsletters
  • Volunteer
  • Support the Trust
    • Become a Member
    • Donate
    • Shop for books, maps, canal souvenirs & seasonal goods
  • Boat Group Home Page

Birtley

You are here

Home » Birtley

Birtley restoration

Birtley, near Bramley in Surrey, has been the focus of activity after we were  able to acquire a 900-metre stretch of abandoned canal in 2018 thanks to the generosity of an overseas member.  The restoration of this stretch including the construction of two lift bridges was completed in 2023.   The restoration has also opened up a new circular walk taking in the restored section of canal the Downlink / Wey-South path. 

Work began in earnest on the first bridge in summer 2019. Visiting working parties and volunteers fenced off the adjacent farmland and created an access track, along with tackling fallen trees and overgrown vegetation. A 300-metre length of three metre-wide surfaced towpath was added, and 350m of canal cleared.

In 2019 three weeks of Waterway Recovery Group Summer Canal Camps, along with the Trust's own working parties, completed the foundations and abutments of Birtley Bridge 1. In 2022 volunteers put the finishing touches to a temporary bridge deck, as well as installing three new gates, allowing the public safe access to the circular walk.

In the latter part of 2022 volunteers began work on Birtley Bridge 2, several hundred metres north of the first bridge. The project first involved relocating a gas main from under the canal and constructing a temporary bridleway for the public to use while construction goes on.

To create a dry surface to work the Trust invested in a Hippo Dam (Aquadam) which when pumped with water rolls out across the canal and creates a seal. This allowed the volunteers to excavate the area and dig a trench for SGN to place the new gas main in.

By the end of 2022 pilings had been installed and the first concrete pour for the foundation walls had been completed.By May 2023, the foundation abutments were completed and an order place for the superstructures for both bridges. The installation of both bridges was completed in October 2023 with an opening celebration taking place on 28th October 2023. 

 

Unrolling the Aquadam
Credits: Dennis Gillen - 19 May 2022
Aquadam in place
Credits: Gill Davies - 19 May 2022
Foundations of original bridge
Credits: Gill Davies - 19 May 2022
Site of bridge 2
Credits: Gill Davies - 7 April 2022
Completed Birtley Bridge 1
Credits: . - 23 October 2021
Installation of temporary bridge
Credits: Roger Beazer - 15 June 2021
Installation of temporary bridge
Credits: Roger Beazer - 15 June 2021
Installation of temporary bridge
Credits: Roger Beazer - 11 June 2021
Installation of temporary bridge
Credits: Roger Beazer - 11 June 2021
Northern Working Party Group constructing temporary bridge deck
Credits: Gill Davies - 20 October 2020

Pages

  • « first
  • ‹ previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • next ›
  • last »

Information

  • Request a Speaker
  • Search the site
  • What's New on the site

About the Canal

  • Canoes & Boats
  • Maps

Activities

  • Public Trips
  • Special Cruises

Other links

  • Login (Volunteers & staff only)
  • Privacy Policy
  • Complaints Procedure
  • Shop for books, maps, canal souvenirs & seasonal goods
  • Volunteers Library Login
Powered by Backdrop CMS